← Back to All News Articles

Providence Bridge to open in November

MODOT road crews laying the deck on the Providence Road bridge over I70.

The deck for the new Providence Road bridge over Interstate 70 in Columbia was poured on Tuesday, Oct. 6. While this milestone showcases the great progress being made, there is still a lot of work to complete before opening the bridge, which is now anticipated for mid-November 2026.

Providence Road over I-70 closed to all traffic at the end of May to reconstruct the bridge and ramps. The new overpass bridge will be longer to accommodate the new I-70 lanes underneath and will be raised to allow taller vehicles to pass under it. The overpass will feature pedestrian crossings on both sides and, thanks to local partnerships including contributions from the Loop CID, new beautification elements will include decorative lighting, enhanced railings and fencing, stone-pattern retaining walls, and bridge facade elements.

The new bridge is now expected to be completed in mid-November. The ramps at the interchange may open ahead of the bridge, dependent on multiple factors, including weather.

All work is weather-permitting and schedules are subject to change.

For more information, call MoDOT at 888-ASK-MODOT (275-6636) or visit www.modot.org. To receive the latest statewide news and text alerts, signup for e-updates.

Green Loop Logo
14 Business Loop 70 East
Columbia, MO 65203
573-443-LOOP
[email protected]

Are you in The Loop?

Subscribe to our newsletter to stay up-to-date on everything The Loop is doing for Columbia.
© 2026 | Website design and development by Pixel Jam Digital
Privacy Policy
crossmenu
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram