fbpx
← Back to All News Articles

I-70 Bridge Update

Traffic Impacts Week of June 20

I-70 Closures

There will be intermittent lane closures in both the eastbound and westbound lanes of I-70 from 8 p.m. to 5 a.m. Monday through Thursday for work at Garth Avenue and Range Line Street.  

Business Loop

  • Business Loop 70/West Boulevard, all on- and off-ramps at Interstate 70 and Business Loop/West Boulevard and the south outer road (I-70 Drive) remain closed to allow for replacing the I-70 bridge over the business loop and building a dual-lane roundabout on the south side of Business Loop 70. 
  • I-70 traffic is detoured onto the Business Loop ramps.
  • The new I-70 bridge at Business Loop will be slid into place in early July.
  • Maps showing the work taking place at Business Loop during the 45-day closure can be found on the project website - www.modot.org/ColumbiaBridges. A video and brochure providing information on how to drive dual-lane roundabouts can also be found there.

Pedestrian Impacts

Visit www.modot.org/ColumbiaBridges for complete information on pedestrian impacts. 

View Construction Progress and Traffic Flow

Business Loop (south side) - http://oxblue.com/open/modot/cams

Business Loop (north side) and Range Line - http://sapp.fullstreamwireless.com/

To learn more about the project or to sign up for weekly email updates, visit the project website at: www.modot.org/ColumbiaBridges.

14 Business Loop 70 East
Columbia, MO 65203
(573) 443-LOOP
[email protected]

Are you in The Loop?

Subscribe to our newsletter to stay up-to-date on everything The Loop is doing for Columbia.
© 2023 | Website design and development by Pixel Jam Digital
crossmenu
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram